NICEIC Approved Contractor · Commercial electrical & data installation
Reliable network cabling for offices, shops and commercial premises
ZJ Electrical Services installs and extends structured data cabling, including Cat6 network points, patch panels and connections between work areas and communications equipment.
From a few additional outlets to a complete office installation, we plan the cable routes around your building, equipment and day-to-day use.

Wi-Fi is useful, but many business devices still depend on a wired connection: computers, printers, access points, phones, CCTV and other network equipment.
Damaged cable or a poor termination can cause intermittent faults or reduce the speed of a connection. A suitable cable route, careful installation and testing help establish a dependable physical link.
Data points positioned where desks and equipment need them.
Organised terminations and labelled connections at the cabinet.
Routes planned around access, containment and the building layout.
Additional connections where the existing installation has suitable capacity.
A real ZJ project

A healthy Gigabit Ethernet link may negotiate at 1000BASE-T. If a cable is damaged or incorrectly terminated, some equipment may fall back to 100BASE-TX even though the connection still works. Other faults can cause dropouts or stop the link altogether.
A lower link speed is a clue, not a diagnosis. Switches, network adapters, patch leads, configuration and the internet service can also limit performance.
The right choice depends on the required performance, run length, environment and future plans.
A practical choice for many normal commercial and office installations, including Gigabit Ethernet connections to everyday business equipment.
Higher-speed use depends on the link length and installation conditions; it should not be assumed simply from the cable label.
May be appropriate where 10GbE is required over the full 100-metre structured-cabling channel, using suitable components and installation practices.
It can require more space and careful route planning. It is not automatically necessary for every office.
From cabinet to workstation
The entire channel matters, not just the cable. Correct termination, matching components, sensible bend radii, cable management and clear labelling all contribute to a usable installation.
A patch lead also connects the switch to the patch panel. The diagram shows the main stages of a typical connection.
Completed runs can be tested to check the cabling and terminations. Agree the required level of testing and documentation as part of the project scope.
Where certification-grade pass/fail testing is required, suitable test equipment can be arranged and used. This provides more information than simply checking whether a device connects.

Additional outlets can often be installed without replacing the whole network. We first consider patch-panel and switch capacity, the new outlet positions and a practical route back to the cabinet.
Ceiling or floor access, containment and the condition of the existing installation affect what can be achieved and how much disruption is involved.
In a refurbishment, data cabling is often best planned alongside electrical first fix, before finishes restrict access. See our Commercial Electrical Fit-Outs & Refurbishments work.
ZJ can coordinate electrical sockets and data outlets in the same project, so desks, printers, access points and other equipment have the connections they need.
Cable routes and containment must be appropriate for the services being installed, including suitable segregation between mains and data cabling.
A few practical details help us understand the scope before quoting.
For larger installations, a site visit may be needed to review the layout and cable routes.
ZJ Electrical Services is an NICEIC Approved Contractor with 14+ years’ electrical experience and genuine experience of Cat6 cabling, patch-panel terminations and commercial containment.
For the wider scope of work, see our Commercial Electrical Services.
We serve commercial premises in Walthamstow, Leytonstone, Hackney, Wanstead, Highams Park and Woodford, as well as the surrounding area.
Often, yes. We check the available patch-panel and switch capacity, cable routes, access and proposed outlet positions before recommending an extension.
Yes. Patch-panel installation and termination can form part of a new cabling project or an extension, with connections organised and labelled for use.
Yes. The testing scope is agreed for the job. Where certification-grade pass/fail reports are needed, suitable test equipment can be arranged.
Yes. A termination fault can cause a slower negotiated link speed, intermittent operation or no connection. Equipment, configuration and the internet service can also affect speed, so the cause needs to be checked.
Cat6A can be specified where the performance requirement and installation conditions justify it. We review the intended use, run lengths and available cable routes rather than recommending it for every job.
They can be coordinated within the same project. The routes and containment must provide appropriate segregation and comply with the requirements for the services being installed.
Send the number of points you need, photos and a simple plan if available. For a larger installation, we can review the layout and proposed cable routes before quoting.
Discuss your data cabling project